To organize the mass
production of autonomous power supply systems, it is necessary to build an
administrative and production complex (66 x 36 m). Any piece of land with an area of
2 hectares, preferably near the road, is suitable for construction . The
presence of energy highways is not required, since the heat and power supply of the
production is also supposed to be provided by an autonomous power supply system by
renewable sources.
The estimated productivity of the enterprise will be 25 sets
of systems per month (or 1 set per day), which is optimal at this stage of system
implementation